Home / Expert Answers / Other Math / 1-using-the-6-steps-outlined-maximize-the-function-p-14x-9y-subject-to-the-constraints-x-y93x-pa242

(Solved): 1. Using the 6 steps outlined, maximize the function P=14x+9y subject to the constraints: x+y93x ...




1. Using the 6 steps outlined, maximize the function \( P=14 x+9 y \) subject to the constraints:
\[
\begin{array}{l}
x+y \le
1. Using the 6 steps outlined, maximize the function subject to the constraints: Use the technique of linear programming to answer the following. 2. A company makes two products. Product requires 3 hours of manufacturing and 1 hour of assembly. Produet B requires 4 hours of manufacturing and 2 hours of assembly. There are a total of 84 hours of manufacturing and 32 hours of assembly available. Using the 6 steps outlined to determine the production to maximize profit if the profit on product is and the profit on product is . 3. A diet is to contain at least 2400 units of vitamins, 1800 units of minerals, and 1200 calories. Two foods, Food A and Food B are to be purchased. Each unit of Food A provides 50 units of vitamins, 30 units of minerals, and 10 calories. Fach unit of Food B provides 20 units of vitamins, 20 units of minerals, and 40 calories. If Food A costs per unit and Food B cost per unit, how many units of food should be purchased to keep costs at a minimum?


We have an Answer from Expert

View Expert Answer

Expert Answer


Solution :- 1) given that Objective Maximize P=14x+9y Subject to the constraints x+y?9 3x+y?10 x?0 y?0
We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe