Home / Expert Answers / Civil Engineering / a-built-up-beam-section-is-formed-by-welding-2-times-l8-times-6-times-1-angles-to-the-bottom-flange-pa699

(Solved): A built-up beam section is formed by welding 2\times L8\times 6\times 1 angles to the bottom flange ...



A built-up beam section is formed by welding 2\times L8\times 6\times 1 angles to the bottom flange of W36x210 as shown in Fig. 1. Determine the following section properties of the built-up cross section: Cross sectional area, A(in^(2)) The location of the centroids CG-X and CG-Y id of the built up section from the bottom of angle ( this value is given, so you need to check that you get this value) Moments of inertia ICG-X (in^(4)){:^(4))^(3) ^(()3) w(l(b)/(f)t)=490pcf S(f(t^(2))/(f)t) W36x210 d=36.7in,A=61.9in^(2) l_(x)=13200in^(4),l_(y)=411in^(4) bf=12.2in,tf=1.36in,tw=0.83in L8x6x1 A=13.1in^(2) I_(x)=80.9in^(4),l_(y)=38.8in^(4) Ybar= 2.65in,(x)/(b)ar =1.65in


We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe