A contractor bids a job at $680 for materials plus $42 per hour for labor. The total cost for the job can be modeled by: C = 42H + 680.
Find the number of hours that he has for the job if the owner would like to total cost to be about $1,900 rounded to the nearest hour.
The contractor should work no more than _____ hours.