Home / Expert Answers / Advanced Physics / a-contractor-wants-to-investigate-the-production-and-cost-differences-of-using-a-7s-blade-on-a-d7-pa943

(Solved): A contractor wants to investigate the production and cost differences of using a 7S blade on a D7 ...




student submitted image, transcription available below
A contractor wants to investigate the production and cost differences of using a blade on a D7H dozer or an S blade on an 824 dozer. The material is very sticky, and it is to be moved a distance of from the beginning of the cut. The dozing is uphill on a grade. The operator will have average skill, the dozers have power-shift transmissions, and traction is assumed to be satisfactory. The site conditions will be good for visibility. The material weighs in the bank state. Job efficiency is assumed to be equivalent to a 55 -min hour. Calculate the direct cost of the proposed earth moving operation in dollars per bcy. Assume the O\&O cost for the D7 dozer is per hour and per hour for the 824 . The operator's wage for the 824 is per hour plus for fringes, workers compensation, and other benefits. The operator's wage for the D7 is per hour plus for fringes, workers compensation and other benefits. a. Which machine would you use on this job? b. It rains and the coefficient of traction of the 824 is now. 0.36 . The coefficient of traction for the D7 is 0.55 . Which machine would you use on this job? Problem \#2 What is the travel time for a scraper moving over a distance of ? Problem \#3 What is the travel time, in minutes, for a scraper moving over a distance of 0.56 miles? Problem \#4 A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select a minimum size shovel that will excavate 450,000 bcy of common earth in a minimum 120 working days of each. The average height of excavation will be 18 , and the average angle of swing will be 80 degrees. The 3 -cy shovel has a maximum digging height of and the 5-cy machine's maximum digging height is . The efficiency factor will be a 50 -min hour. Appropriate size haul units can be used with either shove. How many days will it require to complete the work?


We have an Answer from Expert

View Expert Answer

Expert Answer



We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe