An existing oxidation ditch (OD) was designed and constructed on the basis of zero net sludge production to remove organic matter. The design flow of the (OD) was

25000(m^(3))/(d)

. The design criteria were as follows:

S_(0)=300mgBOD(s)/(L)

, required effluent concentration

(S)=10mgBOD(s)/(L)

Y=0.50mgvs(s)/(m)gBOD

,

Ks=60mgBOD(s)/(L),K_(d)=0.02d^(-1),\mu _(m)=2.0d^(-1)

, X

=3500mg

MLVSS

/L

. A. What is the volume of the OD? B. What is the value of waste activated sludge "Qw" and (8c)? C. What would be the value of " S "if the flow increased to

50000(m^(3))/()

day assuming that X remains

3500m(g)/(L)

? What is your comment on the value of S ? D. What are the values of

S,x

and

(F)/(M)

if we operate the OD on a CFCMR model instead of Zero net sludge model when the flow increases to

50000(m^(3))/()

day? Assume a sludge age value (

\theta c

) of 20 days. E. What are the values of the sludge production"

P_(x)

" and sludge waste "

Q=

" for part " D " above assuming

xr=12000mg

MLVSS

/L

and

x_(e)=20mgs(s)/(L)

?