A double-embedded concrete bar has been constructed using two 10-ft-long segments that each have a different cross section. The bar is subjected at point B to two external forces of 20 kip each. The cross sections of the two segments are square: section AB has dimensions 2-in x 2-in, and section BC is 1-in x 1-in. Using an elastic modulus E = 3,600 ksi for the concrete, calculate the reactions at the two walls.



We have an Answer from Expert

View Expert Answer

Expert Answer


given data cross section of AB bar square cross section =2*2 in cross section of BC bar square cross section = 1*1 in elastic modules of bar E = 3600