Based on Table 10.2, how many observations should be taken on an operation for which the annual activity is 750 pieces and the cycle time is estimated at
15min
?Based on Table 10.2, how many observations should be taken on an operation for which the annual activity is 750 pieces and the cycle time is estimated at
15min
? Table 10.2 Recommended Number of Observation Cycles Source: Information taken from the Time Study Manual of the Erie Works of the General Electric Company, developed under the guid- ance of Albert E. Shaw, manager of wage administration.