Home / Expert Answers / Operations Management / ms-53-an-office-furniture-manufacturer-needs-to-calculate-material-requirements-for-one-of-its-most-pa979

(Solved): MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most ...



MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most popular tables. The graphic above shows the bill of material for this item. Below are the MRP tables for the top-level assembly (the Office Table Final Assembly) and one of its sub-assemblies (the Table-Top Assembly): Office Table Final Assembly 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 Gross Requirements 300 200 300 300 300 100 Scheduled Receipts Projected On-Hand Inv. 400 Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) 1 Lot Size 125 Table-Top Assembly 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 Gross Requirements Scheduled Receipts 150 Projected On-Hand Inv. 100 Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) 2 Lot Size 50 For the Office Table above (the first MRP table), what is the Projected On-Hand Inventory in the week of 9/19? For the Office Table above, what are the Planned Order Receipts in the week of 8/8? For the Table-Top Assembly above, what are the Net Requirements in the week of 9/19? For the Table-Top Assembly above, what are the Planned Order Releases in the week of 9/5?



We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe