Please use Breakdown Structure (WBS) Construction
This week's assignment is to create a work breakdown structure (WBS) for your selected project during Unit 2. This is part of your Course Project. Instructions: Create a high-level WBS comprised of at least three levels:
• Each level should have a minimum of five Level 1 tasks, with two Level 2 tasks, and three (3) Level 3 tasks.
• Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means.
• The First Level of tasks should be numbered:
1.0, 2.0, 3.0, 4.0, and 5.0.
• The Second Level of tasks should be numbered
1.1, 1.2, 2.1, 2.2, etc.
• The Third Level of tasks should be numbered:
1.1.1, 1.1.2, 1.1.3, 1.2.1, etc.
• The Fourth Level of tasks should be numbered:
1.2.2. 1.2.3 etc.