(Solved): power lab Report 1- Mention, four advantages of synchronizing operation. 2- To control the terminal ...
power lab
Report 1- Mention, four advantages of synchronizing operation. 2- To control the terminal voltage of a synchronous generator we must so that we will control the adjust Power too. 3- What is AVR? 4- Two generators are connected in synchronizing manner, G1 and G2. The operator decided to increase the field current of G1 About 5% of its value. As an analyzer: A-How does the power supplied by G1 and G2 will be affected? B-Draw the house diagram that describes the whole of this Operation.