Problem 6: Use a weighted score model to choose between three projects (A, B, C) for updating an important internal process.

Problem 6: Use a weighted score model to choose between three projects (A, B, C) for updating an important internal process. The relative weights for each criterion are shown in the following table as are the scores for each project on each criterion. \( \mathrm{A} \) score of 1 represents unfavorable, 2 satisfactory, and 3 favorable. It is not necessary for the weights to sum to 100 .