An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device.
(a).Draw the precedence diagram for this problem.
(b).What cycle time will allow the production of 200 units over a ten-hour day?
(c).What is the theoretical number of workstations needed?
(d).Balance this assembly line using the heuristic most following tasks.
(e).Determine the balancing efficiency