Severity: Warning
Message: fopen(/home/answnniz/public_html/system/sessions/ci_sessionc2244fd882511e7c23cd4d64d776c54f79da21c5): failed to open stream: Disk quota exceeded
Filename: drivers/Session_files_driver.php
Line Number: 176
Backtrace:
File: /home/answnniz/public_html/index.php
Line: 315
Function: require_once
Severity: Warning
Message: session_start(): Failed to read session data: user (path: /home/answnniz/public_html/system/sessions)
Filename: Session/Session.php
Line Number: 143
Backtrace:
File: /home/answnniz/public_html/index.php
Line: 315
Function: require_once
Takelmer Industries has a different WACC for each of three types of projects Low-risk projects have a WACC of 8.00%, average-risk projects a WACC of 10.00%, and high-risk projects a WACC of 12Which of the following projects do you recommend the firm accept? ProjectLevel of RiskIRR ALow9.50% B Average 8.50% Average7.50% D Low 9.50% E High 14.50% FHigh17.50% GAverage11.50% ABCDE, FG A BC. D. G A BCDE A D EF G CEFG