Use ProModel Simulation Model to run the simulation.
Wooden logs are received at the receivi ...
Use ProModel Simulation Model to run the simulation.
Wooden logs are received at the receiving dock of the Poly Furniture Factory at the rate of one every 10 minutes. Logs go to the splitter, where four pieces are made from each log. The splitting time is Normal (4,1) minutes. The individual pieces go to the lathe, where they are turned for another Triangular (3,6,9) minutes and made into rounds. The rounds go on to a paint booth, where they are con- verted into painted logs. Painting takes Exponential (5) minutes. Painted logs go to the store. Consider a material handling time of one minute between each process. Make a simulation model and run the simulation for 10 hours.
Answer. ProModel is a powerful, Windows-based simulation tool for simulating and analyzing production systems of all types and sizes. ProModel provides the perfect combination of ease-of-use and complete flexibility and power for modeling nearly any