(Solved): WBS work packages are
Question 3 options:
Always at the third level of the WBS
Nodes which hav ...
WBS work packages are
Question 3 options:
Always at the third level of the WBS
Nodes which have no other WBS nodes subtending to them
Assigned to a single individual
Small enough to be completed in a few days