(Solved): Without going through constructing the cyber-net, perform the S-1 contingency of the IEEE 30-bus tes ...
Without going through constructing the cyber-net, perform the S-1 contingency of the IEEE 30-bus test case using MATPOWER power flow (not optimal power flow). Show one hypothesized substation outage and calculate the impact factor for that scenario.