An existing oxidation ditch (OD) was designed and constructed on the basis of zero net sludge production to remove organic matter. The design flow of the (OD) was
25000(m^(3))/(d)
. The design criteria were as follows:
S_(0)=300mgBOD(s)/(L)
, required effluent concentration
(S)=10mgBOD(s)/(L)
Y=0.50mgvs(s)/(m)gBOD
,
Ks=60mgBOD(s)/(L),K_(d)=0.02d^(-1),\mu _(m)=2.0d^(-1)
, X
=3500mg
MLVSS
/L
.
A. What is the volume of the OD?
B. What is the value of waste activated sludge "Qw" and (8c)?
C. What would be the value of " S "if the flow increased to
50000(m^(3))/()
day assuming that X remains
3500m(g)/(L)
? What is your comment on the value of S ?
D. What are the values of
S,x
and
(F)/(M)
if we operate the OD on a CFCMR model instead of Zero net sludge model when the flow increases to
50000(m^(3))/()
day?
Assume a sludge age value (
\theta c
) of 20 days.
E. What are the values of the sludge production"
P_(x)
" and sludge waste "
Q=
" for part " D " above assuming
xr=12000mg
MLVSS
/L
and
x_(e)=20mgs(s)/(L)
?